Beginning of construction of the first Gowind® 2500 corvette built in Egypt

17.04.2016

On Saturday, April 16th 2016, Alexandria Shipyard started cutting metal for the first Gowind® 2500 corvette built in Egypt, in the presence of high representatives of the Egyptian Navy and of DCNS technical assistance and management teams.

2 ASY (c) DCNS

The Egyptian Navy chose DCNS to design and build four Gowind® 2500 corvettes with a construction technology transfer. The contract, which entered into force in July 2015, provides for the construction of the first ship within 29 months. It is now being built by DCNS in Lorient. The three following units will be built by Egyptian partner Alexandria Shipyard.

3 ASY (c) DCNSDCNS has sent supervision and technical assistance teams to Alexandria for the construction of three corvettes through technology transfer. DCNS also provides training of the Egyptian shipyard staff at DCNS site in Lorient. Finally, DCNS will deliver all technical data required for the construction of the corvettes as well as necessary components.

The Gowind® 2500 corvette chosen by the Egyptian Navy is a first rank ship with a displacement of 2,500 tonnes; it incorporates the SETIS® multi-mission combat management system developed by DCNS.

GWD-Egypte_vueEnMer_2_03 ps